Motor Type | TEC 3 Pole 45kW / 54kW electric motor |
---|---|
Electrical Requirements | 380V-480V, 3 phase, 50/60Hz (45kW at 50 Hz / 54 kW at 60Hz) |
Starter | Star Delta |
Pump Type | Kawasaki variable displacement piston pump |
Pump Output (maximum) | 140 lpm, 320 bar |
Filtration | 90 micron suction, 3 micron pressure and 20 micron return (as standard, others available on request) |
Oil Tank Capacity | 460 litre |
Oil Type | ISO 32 as standard, others on request |
Hydraulic Connections | Quick release couplings (client specified type) Pressure: 1” NPT Female; Return: 1 1/4” NPT Female; Case Drain: 3/4” NPT Female |
Cooler | Thermostatically controlled air blast coole |
Control Panel | Mains isolator, Emergency stop button, Start/stop push buttons, Phase reversal indicator, High temp cut off indicator & Low oil cut off indicator |
Deck Cable | 20 metre (when new) 4 Core 25mm^2, 3P+E |
Remote Emergency Stop | 10 metre (when new) |
Moving & Handling | Frame designed in accordance with BSEN12079 4 leg certified sling set Forklift pockets |
Deck Fastening | Sacrificial weld down plates |
Dimensions | 1300mm (L) x 1100mm (W) x 2000mm (H) |
Weight | 2,000 kg (gross) |
- Home
- Rental Equipment
- Electrical Hydraulic Power Units
- 45/54kW Compact Electric Hydraulic Power Unit
45/54kW Compact Electric Hydraulic Power Unit
Enquire about this product
Complete the below form, and we will get back to you as soon as possible
-
-
Our 45/54kW electrically driven hydraulic power unit offers our clients the ability to provide hydraulic power to a variety of different pieces of equipment via a smaller frame – essential if footprint or deck fastening areas are limited.
It also works well in diverse working environments including both on and offshore, and can power equipment such as:
- Hydraulic spoolers
- Reelers
- Cranes
- Diamond wire cutting tools
- Winches
- Hydraulically driven pumps
- Hydraulic flushing units.
From concept to design and manufacture we develop equipment which is safer and more maintenance friendly than any other. Through our teams’ operational experience, we have developed a range of engineering solutions with the user in mind, while also delivering a more cost effective, time efficient and safer package.
We consider every aspect of your project from space accessibility to operational integrity and time constraints. Our teams of professionals will work with you to establish the best solutions, while also offering a bespoke modification service, to ensure your unique project receives the right package to meet your needs anywhere in the world.
-
Related case studies
Latest news
-
Three new job vacancies
13 November 2024 -
Brimmond exhibit at the world's largest energy exhibition in Abu Dhabi
31 October 2024 -
Brimmond secures 5-year service contract with British Antarctic Survey vessel
25 October 2024 -
Independent survey reveals 91% of Brimmond employees say it’s a ‘Great Place to Work’
21 October 2024 -
Marine cranes division plays key role in boosting turnover
23 August 2024 -
Team Brimmond try Bowls!
23 August 2024